I was asked to update my blog! Apparently someone
is interested in my home-improvement projects … or they just needed a good laugh at my expense.
So, in the last 6 months, I have …
Found another leaking hot water supply line. I learned how to solder pipes (thank you, YouTube) and fixed it myself. In the process, the master plumber who works the plumbing aisle in Home Depot was impressed that that this “young lady” was doing the work herself. I’d still like to find the loser “plumber” who did the original work in this house and string him up by his toenails.
Cut out and replaced the upstairs toilet drain from the power room below. There was an offset flange turned 90 degrees the wrong way. Why an offset flange? And why turned the wrong way? I couldn’t get the new toilet set right w/out this fix.
The smells disappeared briefly, but they are back. I’m trying to psych myself up to work on this again … I just really don’t wanna ... but I’m afraid of how much a plumber would charge me. I can be a little cheap that way. Plus, I hate having strange repairmen in my house, and according to me, all repairmen are strange.
Tore down the drop ceiling over the upstairs tub and replaced it (the ceiling).
Bought a new tub … it’s still sitting in the garage.
Fixed most of the laundry room ceiling. It still needs to be textured and painted. That “only” took me a year. I dislike sanding joint compound about as much as I dislike replacing toilets.
Routed the cable TV cable through the walls, rather than through the window. The house was built B.C. (Before Cable). The only thing remarkable about this project is that while doing it, I stumbled upon a walled-off former wet bar that had leaking water supply lines. It was more opportunity to use my new soldering skills.
Finished most of the trim work w.r.t. the kitchen counters and floor.
Finished the jungle gym. That “only” took two years. Placed a ton (literally) of sand under it. Who has the coolest Mom in the whole world????
Added new landscaping to the backyard.
PAID someone (look, look, I hired some workers!) to install sprinklers and someone else to put in 6 yards of mulch. I’m saving up my energy for the plumbing issues. I do draw the line at digging trenches all over my yard, even though my co-workers insist I should be an expert at gluing PVC by now.
Paid someone else to install a new oven, but only because it weighed 230 lbs, and I didn’t feel like dropping that on myself.
Did a bunch of electrical work in the kitchen and garage.
Replaced the pool vacuum booster pump.
The to-do list
I’m afraid to put it in writing for fear that it will depress me. Here are the highlights (lowlights) of what remains (that I am aware of, there are always surprises popping up):
Fix whatever is causing the smells!!!! I have a couple of new ideas to try out … the next time I get motivated to play with waste water pipes … blehhhhhhh.
Finish the upstairs bathroom – install tub, fan, lights, cabinets, paint, and probably pay someone to do the mirrors and countertops. This begs the question – what exactly have I completed in the upstairs bathroom?
Completely re-do the master bathroom. This requires the upstairs bathroom to be done, first. Targeting before Marissa graduates from high school.
Replace the powder room sink and cabinet. A new ceiling would probably be nice, too, since the old one is no longer there (refer to toilet drain repair above).
Finish replacing my last two HVAC ducts. This is about as much fun as playing with waste water pipes. I’ll just wait until it gets cold again … like December would be good.
Convert the pool to salt water. This should pay for itself in less than two year’s worth of chlorine.
Add a range hood to the kitchen. The previous owners took it out. (WHY???) This requires more holes in the ceiling, followed by more joint compound sanding. See my problem?
Do something about the kitchen peninsula countertop.
Replace the laundry room cabinets.
Add/expand drains to prevent Rodgers River the next time it rains 2 inches in 1 hour.
Add/replace more landscaping.
Replace the rotted siding.
Install the zip line (I’ll ask again - who has the coolest Momma ever?!?!??!)
Mods to the swingset were requested. Drawings were provided, along with a schedule and promises to help. The only thing she didn’t do was give me a bill of materials. She’s a little like her Momma. Her schedule was too optimistic, too, just like her Momma. Momma sometimes thinks she can finish all of the above in one weekend.
I’ll check in again in another 6 months and let you know it took more than one weekend …